LUEMBE: A CASE STUDY OF THE AFRICA BRIDGE PROJECT

LUEMBE: A CASE STUDY OF THE AFRICA BRIDGE PROJECT

This paper presents the innovations introduced in the design of the composite bridge – steel and concrete structure – over the Luembe River. These innovations are part of the Africa Bridge project, whose objective is to adapt the traditional composite bridge solution to bridge construction in Africa. Finally, an economic study is presented comparing the composite solution resulting from the Africa Bridge project with a solution using precast concrete girders.

 

AUTHORS | Filipe Santosᵃ, Jorge Vieiraᵃ and Silvio da Silvaᵇ

ᵃ Vesam Angola Lda, Rua do Lobito, No. 9, S. Paulo, Luanda
ᵇ INEA – National Roads Institute of Angola, Luanda

 

Paper presented at the 1st Luso-African Congress on Sustainable Steel Construction, Luanda, Angola

A global company with a presence on 3 continents

Zona Industrial Cantanhede, Lote 69, 3060-197 Cantanhede

+351 231 419 320
info@vesamgroup.com

1350 6th Avenue, 2nd Floor, New York, NY 10019

+1 646 738 8060
usa@vesamgroup.com

Polo Industrial de Viana Estrada de Catete, km 30 Viana – Angola

+244927197588
angola@vesamgroup.com