A new approach of industrial modular structures

A new approach of industrial modular structures

This paper presents a new approach to industrial modular structures, based on the concept of off-site prefabrication and structural testing with the primary goal of minimizing on-site construction time and enhancing alignment precision in accordance with aerospace industry requirements. The study details the manufacturing, pre-assembly, painting, logistics, and on-site assembly processes of the modular structure, as well as their influence on the de-sign and detailing phases. The conclusions highlight the main advantages and challenges of the approach and suggest directions for future developments, particularly regarding sustaina-bility.

 

AUTHORS | Filipe Santosᵃ, Tania Silvaᵃ, Eduardo Gonçalves

VESAM Engenharia S.A., Zona Industrial de Cantanhede, Lote 69, 3060-197 Cantanhede, Portugal, ᵇ MIRA SYSTEMS Lda, Quinta Vale do Espinhal, EM558 1, 3230-343 Penela, Portugal

 

Paper presented at the XIV Congress on Steel and Composite Construction

A global company with a presence on 3 continents

Zona Industrial Cantanhede, Lote 69, 3060-197 Cantanhede

+351 231 419 320
info@vesamgroup.com

1350 6th Avenue, 2nd Floor, New York, NY 10019

+1 646 738 8060
usa@vesamgroup.com

Polo Industrial de Viana Estrada de Catete, km 30 Viana – Angola

+244927197588
angola@vesamgroup.com