Images 1 and 2 – Bridge over the Thinenhi River
Design, preparation, manufacture, transport and assembly of the steel structure. Steel-concrete composite bridge, 15m long and with 1 span, with a composite slab made of collaborating plates.
Images 3 and 4 – Bridge over the Lumege River
Design, preparation, manufacture, transport and assembly of the steel structure. 40 m long single span mixed steel/concrete bridge with a composite slab made with flat slabs.
Images 5 and 6 – Bridge over the River Luchia
Design, preparation, manufacture, transport and assembly of the steel structure. 51m long, 2 span, steel/concrete composite bridge with a composite slab made with flat slabs.
Image 7 – Bridge over the Chirrumbei River
Design, preparation, manufacture, transport and assembly of the steel structure. Mixed steel-concrete bridge, 40m long and with 2 spans, with a composite slab made with flat slabs.
Image 8 – Bridge over the River Cassai
Design, preparation, manufacture, transport and assembly of the steel structure. Mixed steel-concrete bridge, 100m long and with 3 spans, with a composite slab made with flat slabs.